Project 5 - Commercial Space Revitalisation

This stage of the project was completed in 2015. Buildings 2 and 3 were officially opened by WDC on the 9th October.

The central station building has been beautifully restored as a commercial space and is currently being utilised by the new Stoked Eatery - cafe/bar and grill. 

MP Barbara Kuriger and Mayor Brian Hanna

Building two layout

Building two restaurant


Project 5 provides for “Commercial space” within building 2 (the most central of the three buildings)

Internal work on building 2

The canopy (railway side of building 1 and 2) has the new guttering and roof to go on and the wood / steel work has been fully repainted. Three additional steel portals are being added for structural strengthening of the canopy. Fire sprinklers are yet to be installed in buildings 2, 3 and the canopy.

Photo: November 2014 - The canopy (railway side of building 1 and 2) has the new guttering and roof to go on and the wood / steel work has been fully repainted. Three additional steel portals are being added for structural strengthening of the canopy. Fire sprinklers are yet to be installed in buildings 2, 3 and the canopy.

Railway platform view

Fireplace

Key features:

  • Approximately 220sq meters
  • Unfurnished
  • No other fixtures and fittings
  • Small area with plumbing - currently used as a toilet
  • Two access doors to the plaza

It is envisaged that this commercial space will be utilised by one, two or several organisation/ group/ business entities and that internal layout modifications will be required by individual users. 

Project 5 - Commercial Space Revitalisation